Why choose us
Our advantage
Gnee steel group is a supply chain integrated enterprise including steel plate, coil, profile, outdoor landscape design and processing. Founded in 2008, with 5 million RMB registered capital, At present, the total investment amount reaches 30 million RMB,
Operation Advantages
Operation Advantages
 
Pre-qualified raw material suppliers in place
 
QC Daily detail report
 
Pre-qualified manufacturers in place
 
Standard in-process QC chart in place
 
Handover meeting to make operation team fully understand requirements
 
Change orders registering system
 
Specific quality plan,ITP,MPS,Procedures etc in place
 
Material re-test and heat No.tracking system
 
Production Kick off meeting to the mill fully understand the requirements
 
NCR control system
 
Experienced Engineer to assist the mill on technical issue
 
3rd party inspection if needed
 
Qualified QC inspectors full time supervision
 
Final inspection before release
 
Specific Wls,Forms,Records in place
 
Stowage plan before loading
 
Loading survey report after loading
Operation Advantages
Operation Advantages
 
Pre-qualified raw material suppliers in place
 
QC Daily detail report
 
Pre-qualified manufacturers in place
 
Standard in-process QC chart in place
 
Handover meeting to make operation team fully understand requirements
 
Change orders registering system
 
Specific quality plan,ITP,MPS,Procedures etc in place
 
Material re-test and heat No.tracking system
 
Production Kick off meeting to the mill fully understand the requirements
 
NCR control system
 
Experienced Engineer to assist the mill on technical issue
 
3rd party inspection if needed
 
Qualified QC inspectors full time supervision
 
Final inspection before release
 
Specific Wls,Forms,Records in place
 
Stowage plan before loading
 
Loading survey report after loading
Operation Advantages
Operation Advantages
 
Pre-qualified raw material suppliers in place
 
QC Daily detail report
 
Pre-qualified manufacturers in place
 
Standard in-process QC chart in place
 
Handover meeting to make operation team fully understand requirements
 
Change orders registering system
 
Specific quality plan,ITP,MPS,Procedures etc in place
 
Material re-test and heat No.tracking system
 
Production Kick off meeting to the mill fully understand the requirements
 
NCR control system
 
Experienced Engineer to assist the mill on technical issue
 
3rd party inspection if needed
 
Qualified QC inspectors full time supervision
 
Final inspection before release
 
Specific Wls,Forms,Records in place
 
Stowage plan before loading
 
Loading survey report after loading
Operation Advantages
Operation Advantages
 
Pre-qualified raw material suppliers in place
 
QC Daily detail report
 
Pre-qualified manufacturers in place
 
Standard in-process QC chart in place
 
Handover meeting to make operation team fully understand requirements
 
Change orders registering system
 
Specific quality plan,ITP,MPS,Procedures etc in place
 
Material re-test and heat No.tracking system
 
Production Kick off meeting to the mill fully understand the requirements
 
NCR control system
 
Experienced Engineer to assist the mill on technical issue
 
3rd party inspection if needed
 
Qualified QC inspectors full time supervision
 
Final inspection before release
 
Specific Wls,Forms,Records in place
 
Stowage plan before loading
 
Loading survey report after loading
Quality Policy
Gnee is committed to comply with the requirement of the established Quality Management System(QMS) in accordance with the requirement of API Specification Q1 and ISO 9001:2008 Standard and strive for continually improve QMS effectiveness and customer satisfaction through competitiveness and efficiency in manufacturing of steel pipe and steel related services.Health, Safety and Environment Policy
· Cultivate good corporate governance and corporate social responsibility.
· Comply with relevant regulatory requirements and industrial practices.
· Employ and encourage safe working environment to reduce work accidents.
· Actively upgrade human resources through continuous training and development programs.
· Promote environment by preservation by minimizing hazardous industrial waste and effective energy conservation.
Quality Management
Gnee has quality control sytem including all production process starting from raw material and continuing welding wire and flux till to transportation.The tests are guaranteed through test conducted by using modern measurement and equipments, the calibration of these equipments performed periodically by the acrredited corporations.
01
Visual and Dimensional Check Water Leakage Test --Hydrostatic Tests
Non-destructive Tests
 
Automatic Ultrasonic Weld Inspection
Automatic Ultrasonic Body Lamination Inspection
Manual Ultrasonic Inspection
Real Time Radiographic Inspection
Liquid Penetrant Inspection
Magnetic Particle Inspection
Magnetic Field Measurement
Destructive Tests
 
Automatic Ultrasonic Weld Inspection
Automatic Ultrasonic Body Lamination Inspection
Manual Ultrasonic Inspection
Real Time Radiographic Inspection
Liquid Penetrant Inspection
Magnetic Particle Inspection
Magnetic Field Measurement
02
Raw Materail Supply
Raw material is supplied only directly from approved HRC producers. Mill Test Certificates showing full mechanical and chemical properties should 100% conform the tests applied at the final receipt of materials on our own labs.

03
Coil Preparation
Following steps are taken during test and inspection of Raw material
 
Automatic Ultrasonic Weld Inspection
Automatic Ultrasonic Body Lamination Inspection
Manual Ultrasonic Inspection
Real Time Radiographic Inspection
Liquid Penetrant Inspection
Magnetic Particle Inspection
Magnetic Field Measurement
Quality Control
To make sure that every pipe leaving our plant conforms to the high standard we guarantee to our customers, our quality control department will follow seven steps to confirm the quality of our product.
Raw materials should comply with relevant standards and requirements.
Cut the raw steel plate to the required size and length. Cutting should be precise and smooth to ensure smooth progress of subsequent processes. The steel plate is deformed into a round shape through a cold or hot rolling process.
The two ends of the steel plate are welded to form the initial shape of the steel pipe. Welding can use a variety of methods, such as electric welding, welding, etc.
Steel pipes are spirally wound to increase their strength and stability. Spiral winding can be done mechanically or by hand.
Steel pipes are heat treated to improve their physical properties such as strength, hardness, corrosion resistance, etc.
Steel pipes are trimmed to remove surface irregularities and given an anti-corrosion coating to extend their service life.
Conduct quality inspections on steel pipes to ensure they meet relevant standards and requirements. Common inspection items include dimensional measurement, physical performance testing, metallographic analysis, ultrasonic flaw detection, etc. Steel pipes that pass the inspection are packaged and labeled for transportation and use.
additional services
We are committed to providing a range of additional services, whether you require custom sizes, professional cutting and welding services, or fast and reliable logistics, we can accommodate you.
Accept customized services
Surface treatment,Profiling,Beveling,Cutting to Length,Pipe fittings custom assembly,Threading,Protective Coatings.
Produced and tested according to API, ASME, ASTM, BS, DIN, EN, JIS standards
One-stop service
One-stop service includes all-round solutions from steel pipe material selection, design, production, quality control, logistics and transportation to after-sales service.