VR
Project

oil pipeline project

2024-05-24
standard:ASTM
Surface :1. Galvanized 2. Black and Color Painting
introduction
Related Projects
Related Products
Inquiry
introduction
Supply of pipes and fittings to Germany's leading oil and gas producer
Technical difficulty: It is necessary to measure the drilling depth to design different sizes to save drilling time and increase installation speed.
Technical solution: Three different sizes were designed. At 1,200 meters, the 16-inch rope is set at a depth of 1,120 meters, while the 13 3/8-inch rope is set at a depth of 3,495 meters.  To speed up operations and save time on the rig, the 13 3/8” pipe is mounted in brackets (double), increasing installation speed.
Related Products
Related Projects
Chile Oil Pipeline Project
2024-09-11 11:04:36
Chile Oil Pipeline Project
standard:ASTM
Surface :1. Galvanized 2. Black and Color Painting
Spanish boiler refining production
2024-09-18 10:31:13
Spanish boiler refining production
standard:DIN
Surface :1. Galvanized 2. Black and Color Painting
2022-01-06 14:31:40
CASING
Project subject: Industrial exhaust ducts in Romania
Product name: SSAW
Inquiry
Copyright © Gnee Steel (tianjin) Co., Ltd All Rights Reserved.
Support: Coverweb